Commercial Refurbishments
design consult build maintain
Projects
Our recently completed projects

Reception refit

After completely removing the old and outdated reception interior fixtures and fittings, we stripped out the entire corner of the building fabric to allow for a full height glass wall to be installed using double glazed units within powder coated aluminium framework to match with the corporate colours.

We installed all new infrastructure including the sprinkler system, lighting, a solid ceiling complete with a perimeter builkhead, with concealed air conditioning fed through bespoke vents. 

The design of the interior was focused around the custom made reception desk complete with LED lighting.

This was further complemented with a 3D wall panelling installation against the main wall, fitted with the company's brand logos. These were constructed out of  brushed stainless-steel, then with the addition of LED backlighting to stand out even further. 
  1. Reception refit
    A feature wall within the reception area to provide a welcoming and striking first-impression to clients visiting the centre.
  2. Reception refit
    The waiting area provides a light and clean looking feel, whilst providing a comfortable place for clients to relax.
  3. Restaurant refurbishment
    An existing office area was stripped out to allow for a new sleek canteen area, complete with a comprehensive kitchen range.
  4. Reception refit
    A full refit of ceilings, wall cladding, flooring, decoration and reception desk.
  5. Waiting area
    A client waiting area made more welcoming. This was a fully inclusive refit, maintaining a consistent theme with the corporate branding.
  6. Indesit M block
    Renovation of a building. This involved installing a new reinforced steel joist, taking down a supporting wall, installation of new partitions, air conditioning system, electrical works, decoration and flooring.
  7. Restaurant refurbishment
    The new service area for the canteen, with all new bespoke fittings and fixtures.
  8. Corridor refurbishment
    New ceiling system to hide the services above, with partitioning to refresh the look of the area.
  9. Indesit M block
    We installed new floor boxes throughout the area, providing convenient access to electrical and data points.
Making your ideas a reality